Developers Meeting on Weds, October 12, 2016
Today's Meeting Times
- JIRA Backlog Hour: 19:00 UTC in #dspace IRC, i.e. one hour BEFORE the meeting. During that hour, we will be working together to tackle our JIRA Backlog of "Received" tickets.
- DSpace Developers Meeting: 20:00 UTC in #duraspace IRC
Agenda
Quick Notes / Announcements
- Tim will be out-of-office next week (DuraSpace Staff meetings), Oct 17 through 21. Volunteers to lead next Dev Meeting on Oct 19 at 15:00UTC?
- Art Lowel (Atmire) started a Doodle Poll to talk about next steps with Angular 2 UI / DSpace 7: http://doodle.com/poll/5ycsku6r872vkzdn
Discussion Topics
- DSpace 4.7 Status: Where do we stand with the 4.x (backport) release?
- DSpace 6.0 Status. Are we ready for a final RC4? followed by 6.0 (about one week later)?
- "Must Have" tickets that need resolution before 6.0 Final (These are all unresolved tickets flagged "Fix for 6.0" with a priority of "Major" or above.)
- Other "quick win" PRs, which are "nice to haves": https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+label%3A%22quick+win%22+milestone%3A6.0
- "Must Have" tickets that need resolution before 6.0 Final (These are all unresolved tickets flagged "Fix for 6.0" with a priority of "Major" or above.)
- Other 6.0 "known issues" (Any tickets in these lists that are not listed above may be rescheduled for 6.1 or later, if no volunteers are found)
- Other unresolved issues flagged from "testathon":https://jira.duraspace.org/issues/?jql=resolution%20%3D%20Unresolved%20AND%20labels%20%3D%20testathon
- All the PRs flagged for 6.0 (some may need rescheduling): https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+milestone%3A6.0
Ongoing Reminders
- New UI Initiatiave (previously called DSpace UI Prototype Challenge).
- Next phase won't begin until after 6.0 is released
- Team who built the proof-of-concept UI have begun a (rough) list of brainstorming/planning tickets for the next phase
- A User Interface / User Experience Interest Group is in the process of being established (via DCAT). Once established, a call for more members will be made on all lists
- Possible Interest Group(s) for REST API and one for Angular 2 UI design forthcoming.
Meeting Notes
Meeting Transcript
IRC Transcript is available at - http://irclogs.duraspace.org/index.php?date=2016-10-12
Action Items
(Action items go here, if any)