Contribute to the DSpace Development Fund

The newly established DSpace Development Fund supports the development of new features prioritized by DSpace Governance. For a list of planned features see the fund wiki page.

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 17 Next »

Overview

DSpace will standardize on a single, out-of-the-box User Interface.  While third parties are still welcome to develop and distribute alternative interfaces, only one will be distributed with DSpace.

As both the XMLUI and JSPUI are aging, this is an opportunity for supporters of each of these UIs to collaborate on a common UI platform.

Use Cases / Notes

Planning Phase - Selecting a Platform

Timeframe: 3rd and 4th Quarters of 2015. The UI platform will be selected before the end of 2015.

Design Phase - User Experience

Timeframe: Kicking off early in the Development Phase (2016). Because of tight timelines for all this UI work, a full UX redesign may not be possible in the initial version of the new DSpace UI. But, the hope would be to at least do minor cleanup / rework of any UI tools that desperately need it. The new UI itself could be based on existing themes that already provide a better user experience (e.g. Mirage 2, new JSPUI).

  • Find a (part-time?) user experience (UX) designer/expert to create mockups/wireframes (using Balsamiq Mockups or similar) of the new DSpace UI experience
    • Initially this UX design work may concentrate on specific areas that are known to be problematic in DSpace (e.g. Admin tools).
    • This work should involve analyzing examples of good user experience design (in both repository platforms and on the web in general), and finding ways to potentially apply them to the DSpace user experience.
    • Depending on available funds, this person may need to be a volunteer or donated from an institution

Development Phase - Building the UI

Timeframe: Organized development begins in January 2016, and continues until 7.0 Release in late 2016.

  • [December 2015] : Establish a development team (ideally with some overlap with the planning phase team). This team will likely consist of volunteer or "donated" development resources
  • [January 2016] : Schedule a series of development "sprints" which will begin in early 2016. This will allow institutions to donate developers for specific sprints (or allow developers to balance local work with sprint work)
    • Ideally, hold a "hackathon" to help kickstart some of these sprints and get everyone on the same page
    • Development process will be kept transparent (on GitHub) with ongoing status reports to Committers, etc.
    • Ongoing "beta" or early releases will be made available for testing/feedback/analysis by developers and/or DCAT members
  • [June 2016] : Early / Beta version of the new UI is presented at the OR2016 conference in Dublin. Ideally, we'd not only have a demo, but also a training session on the new UI.
  • [Late 2016] : Fully functional new UI in place for the DSpace 7.0 release (tentatively scheduled for Late 2016).
  • No labels