Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Tim will be out of the office Sept 1 2 through 7 (returning on 8th).  Volunteers to lead next week's meeting at 15:00 UTC (on Sept 7)?
  2. DSpace 6.0 Status. RC3 tentative date for Sept 1.  Are we on target?
    1. Two "high priority" PRs left: https://github.com/DSpace/DSpace/pulls?q=is%3Apr+is%3Aopen+label%3A%22high+priority%22
    2. "Must Have" tickets that need resolution before 6.0 Final (These are all unresolved tickets flagged "Fix for 6.0" with a priority of "Major" or above.)
      1. Jira
        serverDuraSpace JIRA
        columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
        maximumIssues20
        jqlQueryproject = DS AND status in (Received, "More Details Needed", "Volunteer Needed", "Code Review Needed", Accepted, "Awaiting Documentation") AND priority in (Blocker, Critical, Major) AND fixVersion = 6.0
        serverIdc815ca92-fd23-34c2-8fe3-956808caf8c5
    3. Other "quick win" PRs, which are "nice to haves": https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+label%3A%22quick+win%22+milestone%3A6.0
  3. Other 6.0 "known issues" (Any tickets in these lists that are not listed above may be rescheduled for 6.1 or later, if no volunteers are found)
    1. Other unresolved issues flagged from "testathon":https://jira.duraspace.org/issues/?jql=resolution%20%3D%20Unresolved%20AND%20labels%20%3D%20testathon
    2. All the PRs flagged for 6.0 (some may need rescheduling): https://github.com/DSpace/DSpace/pulls?q=is%3Aopen+is%3Apr+milestone%3A6.0

...