7.3 Release Plan

Release Schedule (TENTATIVE, may need revising based on OR2022 plans):

  • Thursday, Apr 28 (PR Creation Deadline): All new feature (or larger) PRs should be created by this date. (Smaller bug fixes are welcome anytime)
  • Thursday, May 19 (Review/Test Deadline): All code reviewers or testers should submit their feedback by this date. Code reviews must be constructive in nature, with resolution suggestions. Any code reviews submitted AFTER this date will be considered non-blocking reviews. This means feedback received after Jan 20 is optional to address (unless the team or PR developer decides it is required).
  • Friday, May 27 (PR Merge Deadline): All new feature PRs should be merged by this date. (Bug fixes can still get in, as long as they are small or important)
  • Week of May 30: Internal / Early release goal. If possible, we'd like to release 7.3 in late May or first week of June.
  • Monday, June 6: Public Release Deadline. 7.3 must be announced/released by this date.

Ongoing/Weekly tasks:

Agenda

  • (30 mins) General Discussion Topics
    1. DSpace 7 at OR2022 - What talk(s) are we submitting for OR2022? Proposals due on March 6.
    2. Review tentative 7.3 Release Schedule above. This is based on a new 4-month release window, but could conflict with OR2022 plans.
    3. Any assigned 7.3 work needing early discussion?
      1. What do we need out of e2e (end to end) tests in the Angular UI?  Prompted by discussion of https://github.com/DSpace/dspace-angular/pull/1513
        1. Should e2e tests be only supported against a full DSpace REST API backend, with valid test data (like the Demo entities test data set)?
          1. Cypress notes some advantages/disadvantages: https://docs.cypress.io/guides/guides/network-requests#Use-Server-Responses
          2. Advantages: More like a full system test.  May allow us to automate some of the (usually manual) tests that currently only occur during Testathon.
          3. Disadvantages: May not perform well if you attempt to run it against api7.dspace.org (demo site), as these tests would be highly dependent on the backend being responsive (any major delays in responsiveness will result in tests timing out / failing).  May require local backend with valid test data.
        2. Should e2e tests be only supported against mock data (e.g. via Cypress Stubbing)?
          1. Cypress notes some advantages/disadvantages: https://docs.cypress.io/guides/guides/network-requests#Stub-Responses 
          2. Advantages: Much better performance of tests. More stability running tests both locally and in GitHub CI.
          3. Disadvantages: Mock data must be accurate at all times. If the mock data is ever "out of sync" with the backend responses, it's possible that e2e tests may not find bugs or errors that would exist in a real site.
        3. Recommendations from Cypress
          1. Use full backend for critical paths in your application, or places you want to drive the application like a user would
          2. Use stubs/mocks for edge cases or "hard to create" application states.
      2. (Tentative, only if time allows) What to do about SWORDv2 support?  The Java SWORDv2 library will break as soon as we upgrade Solr Client to 8.10.0 or above (currently we are on 8.8.1), see https://github.com/DSpace/DSpace/issues/8188
        1. How can we address this rapidly?  (If there are any future security vulnerabilities from Apache Solr which require us to upgrade to the latest version of 8.x, then we'll immediately break SWORDv2.)
  • (30 mins) Planning for next week
    • Review the Backlog Board - Are there any tickets here stuck in the "Triage" column?  We'd like to keep this column as small as possible.
    • Review the 7.3 Project Board - Assign tickets to developers & assign PRs to reviewers.
      • Paid (by DSpace project) developers must keep in mind priority. If new "high" or "medium" priority tickets come in, developers should move effort off of "low" priority tasks.
      • Volunteer developers are allowed to work on tickets regardless of priority, but ideally will review code in priority order.

Attendees

Current Work

Project Board

DSpace 7.3 Project Board: https://github.com/orgs/DSpace/projects/16

To quickly find PRs assigned to you for review, visit https://github.com/pulls/review-requested  (This is also available in the GitHub header under "Pull Requests → Review Requests")

New Feature development process for 7.3

  • For brand new UI features, at a minimum, the UI ticket should contain a description of how the feature will be implemented
    • If the UI feature involves entirely new User Interface interactions or components, we recommend mockups or links to examples elsewhere on the web.  (If it's useful, you can create a Wiki page and use the Balsamiq wireframes plugin in our wiki)
    • Feature design should be made publicly known (i.e. in a meeting) to other Developers. Comments/suggestions must be accepted for TWO WEEKS, or until consensus is achieved (whichever comes first).  After that, silence is assumed to be consent to move forward with development as designed.  (The team may decide to extend this two week deadline on a case by case basis, but only before the two week period has passed. After two weeks, the design will move forward as-is.)
    • This does mean that if a UI feature is later found to have design/usability flaws, those flaws will need to be noted in a bug ticket (to ensure we don't repeat them in other features) and fixed in follow-up work.
  • For brand new REST features (i.e. new endpoints or major changes to endpoints), at a minimum we need a REST Contract prior to development.
    • REST Contract should be made publicly known (i.e. in a meeting) to other Developers.  Comments/suggestions must be accepted for TWO WEEKS, or until consensus is achieved (whichever comes first). After that, silence is assumed to be consent to move forward with development. (The team may decide to extend this two week deadline on a case by case basis, but only before the two week period has passed. After two weeks, the design will move forward as-is.)
    • This does mean that some REST features may need future improvement if the initial design is found to later have RESTful design flaws.  Such flaws will need to be noted in a bug ticket (to ensure we don't repeat them in other features) and fixed in follow-up work.
    • REST API Backwards Compatibility support
      • During 7.x development, we REQUIRE backwards compatibility in the REST API layer between any sequential 7.x releases.  This means that the 7.1 REST API must be backwards compatible with 7.0, and 7.2 must be compatible with 7.1, etc.
        • However, deprecation of endpoints is allowed, and multi-step 7.x releases may involve breaking changes (but those breaking changes must be deprecated first & documented in Release Notes).  This means that it's allowable for the 7.2 release to have changes which are incompatible with the 7.0 release, provided they were first deprecated in 7.1.   Similarly, 7.3 might have breaking changes from either 7.1 or 7.0, provided they were deprecated first.
      • After 7.x development, no breaking changes are allowed in minor releases. They can only appear in major releases (e.g. 7.x→8.0 or 8.x→9.0 may include breaking changes).

Issue Triage process for 7.3

  • Overview of our Triage process:
    1. Initial AnalysisTim Donohue will do a quick analysis of all issue tickets coming into our Backlog Board (this is where newly reported issues will automatically appear).
    2. Prioritization/Assignment: If the ticket should be considered for this release, Tim Donohue will categorize/label it (high/medium/low priority) and immediately assign to a developer to further analysis. Assignment will be based on who worked on that feature in the past.
      1. "high priority" label = A feature is badly broken or missing/not working. These tickets must be implemented first, as ideally they should be resolved in the next release.  (Keep in mind however that priorities may change as the release date approaches. So, it is possible that a "high priority" ticket may be rescheduled if it is a new feature that cannot fit into release timelines.)
      2. "medium priority" label = A feature is difficult to use, but mostly works.. These tickets might be resolved prior to the next release (but the release will not be delayed to fix these issues).
      3. "low priority" label = A feature has usability issues or other smaller inconveniences or a non-required feature is not working as expected.  These tickets are simply "nice to have" in the next release.  We'll attempt to fix them as time allows, but no guarantees are made.
    3. Detailed Analysis: Developers should immediately analyze assigned tickets and respond back within 1-2 days. The developer is expected to respond to Tim Donohue with the following:
      1. Is the bug reproducible?  (If the developer did not understand the bug report they may respond saying they need more information to proceed.)
      2. Does the developer agree with the initial prioritization (high/medium/low), or do they recommend another priority?
      3. Does the bug appear to be on the frontend/UI or backend/REST API?
      4. Does the developer have an idea of how difficult it would be to fix? Either a rough estimate, or feel free to create an immediate PR (if the bug is tiny & you have time to do so).
      5. Are you (or your team) interested in being assigned this work?
    4. Final Analysis: Tim Donohue will look at the feedback from the developer, fix ticket labels & move it to the appropriate work Board.  If it is moved to the Project Board, then the ticket may be immediately assigned back to the developer (if they expressed an interest) to begin working on it.
      1. If the ticket needs more info, Tim Donohue will send it back to the reporter and/or attempt to reproduce the bug himself.  Once more info is provided, it may be sent back to the developer for a new "Detailed Analysis".

On Hold Topics

  • Discussing Release Support now that 7.x is out
    1. The DSpace Software Support Policy notes that we support the "most recent three (3) major releases" (where a major release is defined by the changing of the first number, e.g. 6.x → 7.x).  This would mean that 5.x, 6.x and 7.x are all supported at this time.
    2. Should we propose to Committers / Governance a change of policy to the "most recent two (2) major releases"?  This would mean that we move to only supporting 6.x and 7.x.

Notes