Regular Attendees

  • Bill (star)
  • Dan 
  • Danny 
  • Jonathan

General

Discussion Topic

TopicDiscussion Leader
Documentation needs - grant requirementsJonathan
SiDora UpdateDan
Review of Jira tasks in-progressBill

Status

  • Bill
  • Dan
    • See the email record on SIDora, perhaps we are getting closer to a plan/agreement
    • Directory creation is nearly done. Remaining:
      • A good clean up
      • Better code to prevent attempts to create directories twice
      • Error and exception handling (atomic operations)
      • Choose/make a good content model in Sidora for directories
      • Improve tests
      • Fix Bamboo build configuration
    • Execution environment is integrated
      • Add FITS when Directory Creation Done
  • Danny

Minutes

Directory object creation is working
  • Using camel, comes in via camel endpoint (via JMS message listener), and passes to camel splitter
  • Makes use of a StorageObjectEvent class
  • Still some cleanup, exception handling, and testing to finish up prior to commit
  • This path takes the content ID provided by DuraCloud, parses it, and creates the fedora objects to represent the entire tree
  • These are not showing up in the SiDora tree, just need to specify a content model that SiDora understands
    • This was working before, but is not now. May wait for the latest SiDora before trying to get this working
SiDora update
  • Jonathan: trying to put some pressure on DGI to get this done
  • Set of emails has gone out that includes everyone in DuraSpace, DGI, and Smithsonian
  • Current plan:
    • Smithsonian to hand DGI a VMWare image
    • DGI to strip out all unnecessary Smithsonian data, and hand it to us
  • It's still not clear:
    • How long this will take
    • What the current status is of this work
    • What we'll actually get at the end
  • Dan: The core code is in pretty good shape, it's all of the configuration and other bits that is not being managed well
Documentation
  • From proposal
    1. Reports from workshops
      • Initial workshop report is complete
      • Jonathan
    2. Documentation of scenarios and use cases
      • This has been started, but needs to be refreshed
      • Dan
    3. Technical specs
      • Includes DfR Jira record, as well as technical docs
      • Dan to coordinate
      • Danny to complete doc on UpSync
    4. DfR source code (may also include pointer to DuraCloud source code)
      • Need to open this up to the world
      • File headers and licensing should be consistent with DuraCloud
      • Dan to get headers and code in order, Bill to assist and flip the switch to open
    5. Whitepaper on DfR value proposition
      • Value proposition, business case, economics
      • Jonathan
    6. Conference presentations
      • Slides from the various conference presentations which have been given on DfR
      • Jonathan
    7. DfR code base - open sourced
      • Dan/Bill (same as #4)
    8. Final report on DfR
      • Summary of accomplishments, pointers to other documentation
      • Jonathan
    9. Launch service
      • Not going to happen
Demo
  • Need to make this happen along with finishing 0.3
  • UpSync tool pushing content to DuraCloud
  • OCS will pick up new DuraCloud objects, push them into
  • Have a conversation Nov 12 to determine what will be able to fit into the final demo

 

 

  • No labels